Included 328,600 m3 of earth moving.
Project highlights:
- 823 LM of concrete storm sewer (450mm – 1200mm)
- 1255 LM of PVC watermain
- 600 LM of Sanitary
- 2285 LM of curb & gutter
- 1950 LM of Subdrain
- 21,800 TE of granular road base
- 6000 TE of asphalt
- 2258 LM of sanitary forcemain PVC (16″)
- 425 LM directional drill under highway 2 with 16″ HDPE pipe
- Electrical and Lighting Installations
Client:
Edmonton Regional Airport Authority
Market:
Airports
Commercial/Industrial
Sector:
Utilities
Road Construction
Delivery:
General Contracting
Location:
Edmonton, AB